Page 5 - Manual - Mobile Air Conditioner G21 - Envi 12H
P. 5

Instalation

        WARNING
        Before using the mobile air conditioner, keep it upright for at least 2 hours.
        The air conditioner can be easily moved in the room. In the moving process, ensure that the air
        container is in the upright position and the air conditioner should be placed on a flat surface. Do
        not install and use the air conditioner in the bathroom or other humid environments.
        1.  Install the heat pipe assembly, screw the heat pipe assembly into the exhaust port on the rear
        panel (counterclockwise).












        2.  Install the window sealing plate assembly (Air Block - optional accessories).











        3.  Pull the pipe towards the window and insert in into the hole in Air Block seal.
        4.  Install the body
        Move the machine with installed heat pipe and place it in front of the window. The distance
        between the body and walls or other objects should be at least 50 cm.












        NOTICE
        •  The pipe cannot be distorted nor has substantial turning (greater than 45 °). Keep the ventilation
        of the heat pipe unobstructed.
        IMPORTANT NOTICE
        The length of the exhaust hose shall be 280-1,500mm, and this length is based on the specifications
        of the air conditioning. Do not use extension tubes or replace it with other different hoses, or this
        may cause a malfunction.
   1   2   3   4   5   6   7   8   9   10